Log in to use our free company, program and sector update tracker feature.
 

Front page

Fourth Airbus Military A400M makes first flight

The fourth Airbus Military A400M military airlifter has made its first flight - the culmination of a highly successful 2010 which also saw the fleet of Grizzly development aircraft complete just over 1,000 hours flight-time and 300 flights.

Known as Grizzly 4, the aircraft took off from Seville, Spain with a weight of 130 tonnes at 10h18 local time (GMT+1) and landed five hours and ten minutes later.

Experimental Test Pilot Klaus-Dietrich Flade captained the flight, supported by Experimental Test Pilot Christophe Cail. The crew also included Test Flight Engineers Jose Aragon-Gomez and, Bruno Bigand, and Flight Test Engineers Jose Casado-Corpas, and Catherine Schneider. Catherine is the first female Flight Test Engineer and test crew member to participate in an A400M first flight.

Grizzly 4 is the fourth of an eventual five aircraft which will conduct the 3,700 hour flight-test programme leading to first delivery in around two years time. It will be primarily dedicated to cargo and air-to-air refuelling operations and carries a medium flight-test instrumentation load.

Airbus Head of Flight Operations Fernando Alonso said: "The on-time first flight of Grizzly 4 highlights what has been an excellent first year of the flight-test programme. We end 2010 fully on schedule and with every expectation of rapidly building flight-hours and hitting our key test objectives in the year ahead. I am particularly proud of the seamless work done by the Airbus and Airbus Military teams in the Seville and Toulouse Flight Test Centres which has been instrumental in this achievement."

The maiden flight of Grizzly 4 followed the completion of a series of milestones in recent months - notably the first paratrooper jumps from the aircraft, which were highly successful and demonstrated the excellent potential of the aircraft for this military operation. Flights with the ramp and doors open have proceeded smoothly.

An extensive programme of flying the aircraft with simulated icing shapes attached to the wings and tail has been completed. These flights were performed by Airbus and European Aviation Safety Agency (EASA) flight crews and represent the first set of certification tests completed on the A400M.

Preliminary tests of protective kits for rough-field operations have been completed in preparation for next year's trials.

Flight and ground load testing is complete, as is measurement of cruise performance. All major aircraft systems have been tested and flutter tests throughout the flight envelope are extremely close to completion.

The Europrop International (EPI) TP400 engines have been performing well, with the in-flight relight capability having been successfully demonstrated and ground starts following an overnight cold-soak recently performed. Behaviour of the auxiliary power unit has been excellent, and it has been started as high as 40,000ft.

Following the A400M's maiden flight on 11the December 2009, earlier this year Grizzly 2 and Grizzly 3 made their first flights in respectively April and July and their introduction into the fleet made possible the outstanding demonstrations of the A400M's handling qualities at the Berlin and Farnborough airshows.

Press release issued by Airbus Defence & Space HQ on December 20, 2010

 

 Contact details from our directory:
Airbus Defence & Space HQ Airframer

 

 Related aircraft programs:
Airbus A400M

Enhanced listings:


Midland Aerospace
Manufacturer of complex 3- and 5-axis CNC machined and fabricated detail components & assemblies for the aerospace & defence market sectors.

AC Products, Inc.
Full line of peelable maskants for chemical milling, etching, anodizing, acid stripping, plating and more.

EWI
The leading engineering and technology organization in North America dedicated to developing, testing and implementing advanced manufacturing technologies for industry.

Handtmann A-Punkt Automation GmbH
Handtmann 5-axis HSC/HPC machining centres are the ideal solution for a variety of applications in aerospace manufacturing, providing maximum productivity.

Bodycote
The world's leading provider of thermal processing services to aerospace primes and their supply chains.

See our advertising tariff.

 

12
data pages remaining in monthly quota for non-subscribers

© Copyright of Airframer Limited, operated under licence by Stansted News Limited 2017. Terms & Conditions of reading.