Log in to use our free company, program and sector update tracker feature.
 

Front page

Boeing begins final assembly of 1st P-8A Poseidon production aircraft

Boeing [NYSE: BA] today began final assembly of the first U.S. Navy P-8A Poseidon production aircraft in the company's Renton factory. The P-8A is the first of six low-rate initial production aircraft that Boeing is building as part of a $1.6 billion contract awarded by the Navy in January.

The Navy plans to purchase 117 of the Boeing 737-based P-8A anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance aircraft to replace its P-3 fleet.

"Boeing will deliver this first aircraft to the Navy on schedule in 2012 in preparation for initial operational capability, which is planned for 2013," said Chuck Dabundo, Boeing vice president and P-8 program manager. "Our team has built seven P-8A test aircraft to date and the process improvements and efficiencies we've incorporated will continue to help reduce costs as the program moves forward."

The Poseidon team is using a first-in-industry in-line production process that draws on Boeing's Next-Generation 737 production system. All aircraft modifications unique to the P-8A are made in sequence during fabrication and assembly.

The start of final assembly follows Spirit AeroSystems' delivery of the P-8A fuselage to Boeing. The fuselage arrived via rail car on March 7 and was loaded into a tooling fixture. Boeing workers have begun installing systems, wires and other small parts.

"We're excited to transition from the development airplanes to production," said John Pricco, Boeing Commercial Airplanes P-8 program manager. "Our team's tremendous work has put us in a good position as we ramp up to build both the P-8A for the United States and the P-8I for India."

Boeing was awarded a System Development and Demonstration contract in 2004 to build and test six flight-test and two ground-test P-8A aircraft. The first three flight-test planes -- T1, T2 and T3 -- are completing testing at Naval Air Station Patuxent River, Md. The program's static test plane, S1, completed its test program earlier this year.

A derivative of the Next-Generation 737-800, the Poseidon is built by a Boeing-led industry team that includes CFM International, Northrop Grumman, Raytheon, Spirit AeroSystems, BAE Systems and GE Aviation.

Press release issued by Boeing Defense, Space & Security on March 9, 2011

 

 Contact details from our directory:
Boeing Defense, Space & Security Airframer
Spirit AeroSystems, Inc. Wing Flaps, Empennages, Nacelles, Wings, Aircraft Control Surfaces, Aircraft Structural Components, Thrust Reversers, Engine Pylons, Fuselage Sections, Engine Inlets, Wing Spoilers, Fairings, Machining Services

 

 Related aircraft programs:
Boeing 737

 

 Related directory sectors:
Airframe Assemblies

Enhanced listings:


Midland Aerospace
Manufacturer of complex 3- and 5-axis CNC machined and fabricated detail components & assemblies for the aerospace & defence market sectors.

Ascent Aerospace
Ascent Aerospace is the leading provider of aerospace tooling systems, assembly automation and factory integration.

Victrex Plc
New VICTREX® AE250 composites and hybrid molding technology are changing the equation in Aerospace composites – find out more!

Beckwood Press
Your single source for aerospace forming equipment. Manufacturer of Triform Sheet hydroforming presses.

Sigma ASL Limited
Engineering and manufacturing company with in-house and outsourced operations, AS9100 accredited and fully NADCAP compliant.

See our advertising tariff.

 

8
data pages remaining in monthly quota for non-subscribers

© Airframer Limited, operated under licence by Stansted News Limited 2018. Terms & Conditions of reading. Privacy policy