Log in to use our free company, program and sector update tracker feature.
 

Front page

Ice accretion on the unprotected winglet and a test probe of a G250 flight-test aircraft. The leading edge of the wing remains ice-free. The G250 recently completed the natural icing tests required for its certification later this year.

Gulfstream G250 completes natural icing tests

Gulfstream Aerospace Corp.'s second Gulfstream G250 flight-test aircraft successfully completed natural icing tests, bringing the large-cabin, mid-range aircraft several steps closer to its certification later this year by the Federal Aviation Administration and the Civil Aviation Authority of Israel.

Serial Number (S/N) 2002 left its home base in Israel last month, crossed the Atlantic and landed in Smryna, Tenn., where it spent several weeks flying to the Great Lakes region to hunt for natural icing conditions aloft.

The G250 successfully completed the test points required for certification, including allowing ice to build up on the aircraft's unprotected surfaces and then verifying the aircraft's stability and control characteristics, as well as evaluating the ice protection systems and the tolerance of the aircraft after being exposed to icing conditions for 45 minutes.

"The G250 performed exceptionally well," said Pres Henne, senior vice president, Programs, Engineering and Test, Gulfstream. "During one particular flight, the crew encountered icing concentrations in excess of the regulatory design envelope. The aircraft remained in this condition for an equivalent icing exposure time of more than 50 minutes to allow adequate accumulation of ice. Despite the extremely demanding conditions and ice accumulation on all untreated surfaces, the aircraft performed flawlessly."

The anti-ice system on the leading edge of the G250 wing was adapted from large-cabin Gulfstream aircraft. Heated bleed air from the engines is routed to the leading edges to prevent ice formation.

S/N 2002 will now undergo overnight cold-soak trials, having completed a similar test in Finland. The aircraft has also completed hot-weather testing on the coast of the Red Sea.

S/N 2003 has started function and reliability testing in Israel, where the G250 is manufactured in cooperation with Israel Aerospace Industries (IAI). Function and reliability tests demonstrate that the aircraft, its components and its systems consistently operate as expected. Reaching this point is considered a major milestone toward certification.

With flight test well under way, manufacturing continues for the first production aircraft, S/N 2004. The empennage and wing have been joined to the fuselage, and installation of the aircraft's systems has begun.

Component-level fatigue testing on the main landing gear and rudder continues, while the full-up fatigue test article, S/N 1999, proceeds with preparation for testing over 40,000 cycles.

The three aircraft in the flight-test program have already accrued more than 955 hours in 324 flights.

Press release issued by Gulfstream Aerospace Corporation on March 22, 2011

 

 Contact details from our directory:
Gulfstream Aerospace Corporation Airframer
Israel Aerospace Industries Ltd. Airframer

 

 Related aircraft programs:
Gulfstream G280

Enhanced listings:


EuroLink International Sales & Marketing
Build sales faster! International business development services for vendors to the aerospace sector. Multilingual technical sales & marketing to OEMs, MROs, and Tier suppliers.

Ascent Aerospace
Ascent Aerospace is the leading provider of aerospace tooling systems, assembly automation and factory integration.

Airmo Inc. Pressure Technologies
Airmo manufactures systems and tools for hydrostatic testing, end forming, tube expansion, and high-pressure accessories to 60,000psi (4,137bar).

IHS ESDU
Reduce the time spent on current projects by using ESDU – engineering data and software that have been approved and endorsed by professional institutions.

Zeus Industrial Products, Inc.
Delivers precision polymer solutions that transform businesses & markets. 50 years' dedication to building partnerships, products and services.

See our advertising tariff.

 

12
data pages remaining in monthly quota for non-subscribers

© Copyright of Airframer Limited, operated under licence by Stansted News Limited 2017. Terms & Conditions of reading.