In preparation for the maiden flight of the new MC-21 airliner, Irkut Corporation began tests of MC-21-300-0001 aircraft on frequency response.
Other progress on the aircraft in preparation for flight tests includes:
- fuselage has been tested for airtightness
- on-board measurement systems and equipment have been installed
- aircraft systems are undergoing adjustment procedures
- the aircraft is switched to electric power
The works are held in the final assembly shop of the Irkutsk Aviation plant with the participation of specialists from the Central Aerohydrodynamic Institute named after N.E. Zhukovsky (TsAGI).
Contact details from our directory: | |
Irkutsk Aviation Plant | Airframer |
Related aircraft programs: |
Irkut MC-21-300 |
Related directory sectors: |
Airframe Assemblies |
Weekly news by email:
See the latest Bulletin, and sign up free‑of‑charge for future editions.
STOL variant P2012 achieves EASA certification
Kite Magnetics unveils ultra-high efficiency propeller for electric aircraft
Sweden calls on GKN for future fighter propulsion concepts
Construction begins on Boeing MQ-28 production facility in Queensland