Log in to use our free company, program and sector update tracker feature.
 

Front page

Boeing to recognize third-quarter charge for the 747 program

The Boeing Company (NYSE: BA) today said it expects a pre-tax charge against third-quarter results of approximately $1.0 billion due to increased production costs and the difficult market conditions affecting its 747-8 program.

Approximately $640 million of the charge reflects higher estimated costs to produce 747-8 airplanes at both Boeing and supplier facilities. As the program assembled major components of initial 747-8 Freighters during the third quarter, it became clear that late maturity of engineering designs has caused greater than expected re-work and disruption in manufacturing. This is resulting in additional resources being applied on the program and higher supplier expenses, which are the primary cost drivers.

The remaining $360 million of the charge relates to challenging market conditions and the company's decision to maintain the 747-8 production rate at 1.5 airplanes per month nearly two years longer than previously planned, deferring an increase to 2 per month. Higher allocation of fixed expenses and volume-based penalties to suppliers are the main drivers of the additional costs.

Because the 747 program is in a loss position, costs associated with the factors above will be immediately recorded in the third quarter for future 747-8 deliveries.

The company now expects first flight of the 747-8 Freighter to occur by early next year with the flight test program taking place in 2010. First delivery of the 747-8 Freighter is now expected in the fourth quarter of 2010. First delivery of the Intercontinental passenger variant remains scheduled for the fourth quarter of 2011.

The third-quarter tax benefit related to the 747 charge and the previously announced 787 charge is expected to be approximately 31 percent. The full-year tax benefit for both charges is expected to be approximately 37 percent. Boeing will update its 2009 financial guidance on October 21 when it reports third-quarter results.

Press release issued by Boeing Commercial Airplanes on October 6, 2009

 

 Contact details from our directory:
Boeing Commercial Airplanes Airframer

 

 Related aircraft programs:
Boeing 747

Enhanced listings:


Victrex Plc
New VICTREX® AE250 composites and hybrid molding technology are changing the equation in Aerospace composites – find out more!

TenCate Advanced Composites
TenCate Advanced Composites is a leading provider of thermoset and thermoplastic prepregs to the aerospace industry.

Dymax Corporation
A leading manufacturer of advanced light-curable adhesives, maskants, coatings, oligomers, light-curing equipment, and fluid dispense systems.

Bodycote
The world's leading provider of thermal processing services to aerospace primes and their supply chains.

MW Industries, Inc
Design and manufacture springs, fasteners and related products for aerospace including: engine components, flight controls, propulsion, landing gear, interiors and avionics.

See our advertising tariff.

 

12
data pages remaining in monthly quota for non-subscribers

© Copyright of Airframer Limited, operated under licence by Stansted News Limited 2017. Terms & Conditions of reading.