Log in to use our free company, program and sector update tracker feature.

Front page

Boeing elects to conduct inspections on 787s before flying

Boeing [NYSE:BA] recently identified a workmanship issue with the 787's horizontal stabilizers. Some airplanes have issues with improperly installed shims and the torque of associated fasteners. This finding requires inspection of all airplanes and rework if discrepancies are found.

An inspection and rework plan already is implemented for airplanes in production. For those airplanes requiring rework, we expect it will take up to eight days for each airplane. It is not unusual for these issues to arise in the course of production programs – they are identified, dispositioned and dealt with through our normal processes.

Reports that the fleet is "grounded" are incorrect. Boeing has made the decision to inspect the horizontal stabilizers on all flight test airplanes before their next flights to ensure any rework is completed as quickly as possible. Inspections are expected to take one to two days.

We expect that this issue will be addressed within the existing program schedule. The 787 remains on track for first delivery to ANA by the end of this year.

Press release issued by Boeing Commercial Airplanes on June 25, 2010


 Contact details from our directory:
Boeing Commercial Airplanes Airframer


 Related aircraft programs:
Boeing 787 Dreamliner

Enhanced listings:

Valence Surface Technologies
The leading metal processing company serving the global aerospace industry. Valence’s ten facilities offer full-service capabilities: NDT, shot peen, chemical processing, paint, and other coatings.

General Plastics Manufacturing Co.
General Plastics has been supplying OEMs, Tier 1 and Tier 2 companies with flame-retardant foam core materials and custom flexible foam molded parts for aircraft flight decks and interior cabins for over 50 years.

USA Borescopes
USA Borescopes is a global supplier of world class visual inspection equipment. We are the one stop source for aviation professionals.

Belden Universal
Specialty universal joints and drive shafts, designed to satisfy even the most rigorous operating criteria. Belden Universal is AS9100C certified.

The leading provider of heat treatment services worldwide. Bodycote offers high quality, reliable and cost-effective services to manufacturers whatever their size or market sector.

See our advertising tariff.


Monthly page limit exceeded. Please buy a subscription.

© Copyright of Airframer Limited, operated under licence by Stansted News Limited 2016. Terms & Conditions of reading.