This website uses cookies
More information
Navigate directly to favourite company, aircraft and sector pages with our tracker feature.

PRESS RELEASE
Issued by:

Airbus BelugaXL passes ground vibration test
Wednesday, 6 June 2018

The first BelugaXL has passed the Ground Vibration Test (GVT), a requirement for certification of the aircraft that paves the way towards its maiden flight in summer 2018.

The objective of this test is to measure the dynamic behaviour of the aircraft and confirm theoretical models of various flight conditions, such as manoeuvring, flying in gusty conditions and landing. The test data also helps clear the aircraft's flight enveloppe.

The GVT of the BelugaXL was performed by ONERA in collaboration with DLR over eight testing days using several hundreds of external accelerometers while the aircraft was stimulated by external shakers or seismic exciters.

The BelugaXL was launched in November 2014 to address the transport and ramp-up capacity requirements for Airbus beyond 2019. The new oversize air transporters are based on the A330-200 Freighter, with a large re-use of existing components and equipment. The first of five BelugaXLs will fly in summer 2018 and enter into service in 2019.

Contact details from our directory:
Airbus S.A.S. Airframer
ONERA Office national d’Etudes et de Recherches Aérospatiales Aerodynamic Test Services, Testing Services, Research/Consulting Services, Technical/Eng/Scientific Studies, Wind Tunnels
DLR - German Aerospace Center Fuel Cells, Testing Services, Research/Consulting Services, Composite Design Consultants, Flight Simulators, Instrument Landing Systems, Prototyping, Airframer
Related aircraft programs:
Airbus A330