Press release
13/06/2013
Accudyne Systems completed installation of an Automated Fiber Placement (AFP) machine in the Composites Center located at the University of Bristol, UK. The AFP equipment delivers twelve ends of 0.25 inch-wide (6.4 mm) thermoset tow that are stored in a temperature controlled creel. It features automatic tow cut & add and infrared substrate heating. There are seven coordinated axes utilizing Siemens controllers and linear motors which provide fast machine movements and precise machine positioning. Tow path programming is provided by Coriolis CADFiber enabling fabrication of highly contoured parts. The machine delivers laydown rates of up to 33 ft/min (10 meters/min) and 10 lbs/hr (4.5 kg/hr).
Send releases and photographs to news@news.airframer.com — the pick of them reach Bulletin readers every Thursday.
The week’s aerospace manufacturing news, reported by our editors and delivered free to your inbox. Sign up ›
Subscribers see the confirmed supply chain behind every story — complete supplier lists for each aircraft program, sector and company. See the plans ›
Corrections go straight to the editorial team that maintains this directory.