Airframer
NewsPress release

Press release

Boeing 787 Dreamliner structure test a success

02/07/2008

Press releaseIssued by Boeing Commercial Airplanes.

Alenia Aeronautica, a Finmeccanica company, successfully completed destructive testing on the horizontal stabilizer of the Boeing [NYSE: BA] 787 Dreamliner. The test took place at Alenia's Pomigliano plant in Naples with Boeing engineers and representatives of the U.S. Federal Aviation Administration (FAA) and European Aviation Safety Agency (EASA) in attendance. The stabilizer is made at the Alenia Aeronautica plant at Foggia in Italy's Puglia region.

Previous physical testing had shown that the horizontal stabilizer meets its certification requirement to withstand 150 percent of the maximum aerodynamic load it ever could encounter in flight. Once Alenia engineers proved that, they then tested the horizontal stabilizer to see just much load the horizontal stabilizer could withstand before failure. In that test, the structure did not break until well in excess of the required 150 percent of limit load. The destructive test was the culmination of seven months of testing conducted by Alenia and Boeing.

"This is quite an achievement," said Nazario Cauceglia, Alenia Aeronautica's chief technical officer. "The test validates the innovative multispar design concept and consolidates the spirit of cooperation established between Alenia and Boeing engineers on this difficult task, and on the entire 787 program."

"Successful completion of the 787 horizontal stabilizer failure test marks the culmination of an innovative design and development activity," said Randy Harley, vice president and general manager, 787 Engineering and Technology. "Working together, the 787 team has once again confirmed the power of an integrated partnership."

Previous tests at Pomigliano gauged the structure's capability to withstand various extremes in aerodynamic pressures, such as upward and downward deflection and extreme asymmetric loads.

With static testing complete, Alenia now will proceed to fatigue testing. Alenia engineers at Pomigliano will subject a complete horizontal stabilizer to repeated flexing, meant to demonstrate the stabilizer's ability to carry repeated operational load cycles representative of its design life. To obtain certification the tail will be tested to at least three times its design life. The testing program is slated to conclude with Boeing conducting a bird strike test at its facilities in the U.S.

The industry ledger — an Analytics feature — collects the dated facts behind stories like this one, filterable by theme, company, program, country and date. See a worked example →

In this release

Programs covered
Sectors covered
Companies covered
Your news here

Submit your press releases

Send releases and photographs to news@news.airframer.com — the pick of them reach Bulletin readers every Thursday.

Every Thursday

The Airframer Bulletin

The week’s aerospace manufacturing news, reported by our editors and delivered free to your inbox. Sign up ›

Go deeper

Who supplies whom?

Subscribers see the confirmed supply chain behind every story — complete supplier lists for each aircraft program, sector and company. See the plans ›

Spotted something wrong or out of date on this page? Tell us

Corrections go straight to the editorial team that maintains this directory.