Airframer
Quintus Technologies Quintus Technologies
NewsPress release

Press release

GKN Aerospace teams with FMW Composite Systems in the first use of 'TMMC' material on a commercial aircraft programme - for the Boeing 787.

19/10/2007

Press releaseIssued by GKN Aerospace - Cowes.

GKN Aerospace has been awarded a contract by Boeing to develop and supply advanced titanium metal matrix composite (TMMC) thrust links for the Boeing 787. This represents the first use of TMMC in a commercial application.

TMMC is an advanced engineered material consisting of silicon carbide fibre and titanium powder that has been diffusion bonded. This creates a hybrid material that is stiffer and stronger than conventional titanium alloys. TMMC offers major weight savings of 25% to 40% over traditional steel or inconel thrust links and increased temperature tolerance over monolithic titanium.

A new TMMC manufacturing process has been developed by GKN Aerospace's partner, FMW Composite Systems Inc. FMW developed this cost-effective method of TMMC manufacture by producing their own fiber material, and using powdered titanium in the diffusion process to keep material costs low. GKN Aerospace and FMW will partner on this contract and in seeking other teaming opportunities for TMMC in the aerospace sector.

The Boeing 787 thrust link will comprise an FMW manufactured TMMC centre tube, which GKN Aerospace will plasma-weld to two machined titanium end lugs, final machine and assemble. GKN Aerospace will also manage the contract, supplying two versions of the thrust link to enable integration with either the Rolls-Royce Trent 1000 or the GEnx engine.

Frank Bamford, Senior Vice President of Business Development and Strategy for GKN Aerospace comments: "GKN Aerospace has a reputation for the successful application of state of the art technologies to create effective operational products - and this is something we are achieving here with our partners FMW. FMW's innovative TMMC manufacturing skills and our expertise in program management - and in the complex welding of highly loaded titanium structures using our low-cost machining centre in Mexico - means the Boeing 787 will be the first of many civil aircraft to benefit from this immensely promising development."

The industry ledger — an Analytics feature — collects the dated facts behind stories like this one, filterable by theme, company, program, country and date. See a worked example →

In this release

Programs covered
Sectors covered
Companies covered
Your news here

Submit your press releases

Send releases and photographs to news@news.airframer.com — the pick of them reach Bulletin readers every Thursday.

Every Thursday

The Airframer Bulletin

The week’s aerospace manufacturing news, reported by our editors and delivered free to your inbox. Sign up ›

Go deeper

Who supplies whom?

Subscribers see the confirmed supply chain behind every story — complete supplier lists for each aircraft program, sector and company. See the plans ›

Spotted something wrong or out of date on this page? Tell us

Corrections go straight to the editorial team that maintains this directory.