Press release
09/04/2010
Lockheed Martin's F-35C Lightning II carrier variant ground-test article, CG-1, undergoes drop testing at Vought Aircraft in Dallas - one of 53 tests planned for CG-1 at Vought. On March 27,CG-1, was dropped 95 inches at 20 feet per second, with an 8.8-degree pitch, 2-degree roll, and 133-knot wheel speed, simulating a carrier-deck landing. During the testing, 500 sensors are monitored, with 2,500 points collected per second. The F-35C will be the Navy's first stealth fighter. In addition to ground testing, flight test continues, with more than 170 test flights logged. During the first quarter of 2010, the three F-35B test aircraft at Naval Air Station Patuxent River, Md., outperformed flight test requirements, completing 33 flights compared to the 29 required. Twenty-eight of the flights took place at Patuxent River, with the remaining five conducted from Lockheed Martin's Fort Worth plant.
Send releases and photographs to news@news.airframer.com — the pick of them reach Bulletin readers every Thursday.
The week’s aerospace manufacturing news, reported by our editors and delivered free to your inbox. Sign up ›
Subscribers see the confirmed supply chain behind every story — complete supplier lists for each aircraft program, sector and company. See the plans ›
Corrections go straight to the editorial team that maintains this directory.