Airframer
NewsPress release

Press release

Royal Engineered Composites announces $5M expansion

08/04/2026

Press releaseIssued by Royal Engineered Composites, Inc..

Royal Engineered Composites, a leading manufacturer of advanced composite structures, today announced a 23,500-square-foot expansion of its Minden, Nebraska facility. The $3M building addition, coupled with $2M in new equipment, positions Royal to provide full-scale, in-house manufacturing for large section-level assemblies.

The expansion optimizes the workflow for large-scale parts, creating a seamless environment for Royal to cure, trim & inspect large parts in-house. Central to this investment is the acquisition of a large-format SDI Delta X Gantry C-Scan system, scheduled for delivery in July 2026.

"Over the past few years, we’ve added larger assemblies that pushed the boundaries of our existing footprint," said Dave Arnold, President of Royal Engineered Composites. "This expansion isn't just about more space; it's about providing a complete, in-house solution. By eliminating the need to ship large parts to third parties for inspection, we significantly reduce lead times and maintain the flexibility our customers require."

Added Capabilities

The investment includes a suite of new technology designed for precision and speed:

- SDI Delta X Gantry C-Scan: A 10-axis, dual-head overhead system (180" x 72" x 120") featuring dual-frequency detection (1Mhz and 5Mhz). It includes - a Tone Burst/Square Wave Pulser specifically for penetrating highly attenuative materials.

- CMS Model 3618 CNC: High-capacity machining with dual-zone trimming capability, now fully operational.

- Rapid Prototype Post-Cure Oven: Significantly compresses lead times for new programs by accelerating tool development.

- Mobile FARO Inspection: Provides dynamic, high-precision measurement for large-format parts anywhere on the floor.

Workforce Growth

The facility expansion coincides with a significant hiring initiative. Royal is in the process of adding 70 new positions, 46 of which have already been filled, bringing the total workforce to approximately 250 employee-owners.

Groundbreaking Event

A formal groundbreaking ceremony will take place at the Minden facility on April 20th. Members of the press, industry partners, and the public are invited to attend. The building expansion is expected to be complete by the end of 2026.

The industry ledger — an Analytics feature — collects the dated facts behind stories like this one, filterable by theme, company, program, country and date. See a worked example →

In this release

Sectors covered
Companies covered

People in this release

David ArnoldPresident · Royal Engineered Composites, Inc.in

Where we hold a LinkedIn profile it’s marked — the links come with a subscription.

Your news here

Submit your press releases

Send releases and photographs to news@news.airframer.com — the pick of them reach Bulletin readers every Thursday.

Every Thursday

The Airframer Bulletin

The week’s aerospace manufacturing news, reported by our editors and delivered free to your inbox. Sign up ›

Go deeper

Who supplies whom?

Subscribers see the confirmed supply chain behind every story — complete supplier lists for each aircraft program, sector and company. See the plans ›

Spotted something wrong or out of date on this page? Tell us

Corrections go straight to the editorial team that maintains this directory.