Press release
21/08/2012
The first Typhoon tranche 3 front fuselage unit has rolled off the production line at our Samlesbury site.
Under the Tranche 3A contract signed in 2009, a total of 112 aircraft have been ordered for the four European partner nations, with 40 aircraft bound for the Royal Air Force. Deliveries of Tranche 3 aircraft are expected to start in 2013.
Building on the success of the Typhoons already proven in service, as demonstrated during Libyan Operations, Tranche 3 aircraft will be even more capable.
The Tranche 3 front fuselage, part of the British single seat aircraft number 116, includes over 350 modified parts designed, engineered and assembled ready to incorporate the most advanced capability enhancements.
Those enhancements include provision for conformal fuel tanks and a fuel dump system which will enable Typhoon to fly further and stay on mission longer. Also included are extra electrical power and cooling to cater for an E-Scan radar which will enhance performance, reliability and availability whilst delivering lower support costs for Typhoon customers. Extra computing power and high speed data network systems will give the aircraft capacity for even more capability in the future.
Send releases and photographs to news@news.airframer.com — the pick of them reach Bulletin readers every Thursday.
The week’s aerospace manufacturing news, reported by our editors and delivered free to your inbox. Sign up ›
Subscribers see the confirmed supply chain behind every story — complete supplier lists for each aircraft program, sector and company. See the plans ›
Corrections go straight to the editorial team that maintains this directory.