Every Bulletin story and press release covering Boeing 737, newest first.
360 items · page 2 of 8
Built with ultra-strong lightweight composites, the workstations improve aircraft and weapon systems' performance. They have an optimal viewing angle for both seated and standing crew members.
Since 2012 Boeing has tested 200 ecoDemonstrator technologies, and a third have it made it into products and services, contributing to improvements in noise, economy, emissions, safety and environmental impact.
Senior Aerospace is a long-standing supplier to Boeing for critical components such as the floor beams and flight control assemblies now the subject of new multi-year contracts.
Triumph's latest contract extension includes key equipment and components used in the landing gear actuation, nose wheel steering, engine cowl door opening, brake, hydraulic and slat control systems.
The partners have built three plants in Rochester (New Hampshire), Commercy (France) and Queretaro (Mexico). These are dedicated to 3D composite parts and have produced 130,000 for the LEAP engine.
Titanium parts from VSMPO-AVISMA, a Boeing supplier for 25 years, are used on Boeing 737, 767, 787, 777 and 777X aircraft. A new deal seals this trade into the future, and should expand the supplier's role.
Spirit has chosen Turkish Aerospace to manufacture and supply over 400 parts and sub-assemblies for a variety of Boeing platforms in addition to the contract to produce Section 48 tail feathers for the 737 MAX-8.
Avcorp has signed a contract with Boeing to continue providing wheel well fairing assemblies for the 737 MAX. It has been a supplier to the airframer for more than 20 years.
The 737-10 can carry up to 230 passengers. It also incorporates environmental improvements, cutting carbon emissions by 14 percent and reducing noise by 50 percent compared to today's Next-Generation 737s.
Norway is expected to receive its first P-8 later this year. In total, five P-8s will eventually replace Norway's current fleet of six P-3 Orions and three Falcon 20s. The first fuselage has arrived in Renton.
The collapse in world air travel, and resulting chaos in the airline industry, is trickling down through the supply chain. Spirit's work on twenty Boeing 737 MAX aircraft due to be delivered this year has been put on hold.