Airframer
ProgramsBAE Tempest

Aircraft program

BAE Tempest

In production
Logbook Follow this page and keep your own private notes on it — log in to start

Stealth fighter concept to replace the Eurofighter Typhoon, developed through Future Combat Air System (FCAS) programme and Global Combat Air Programme (GCAP). Unmanned aircraft accompanied during flight by swarm of drones. Under development.

BAE Tempest
Lift type
Fixed wing
Construction
Factory-built
Control
Piloted, Autonomous
Engine type
Turbojet
Application
Fighter

Design & construction

Primary structure
Composite
Wing
Composite
Landing gear
Retractable tricycle
Ice protection
Bleed air
Pressurisation
Pressurised
Flight controls
Full FBW digital
Avionics architecture
IMA
Environmental control
Engine-bleed air-cycle
Wing position
Mid
Planform
Delta
Tail
Canard
Certification
Military
Minimum crew
1
Composite wing (primary structure) Primary Composite fuselage (primary structure) Primary Additive-manufactured structural parts Planned Head-up display Standard Synthetic vision Standard Enhanced vision (EVS/EFVS) Standard

Technical reference compiled with AI research; a value appears only where two independent research passes and a web fact-check agree. Gaps are deliberate.

A deeper insight into the BAE Tempest

Supplier geography and market analysis for this program — shown free on sponsored programs, or with an Analytics subscription.

See Analytics rates
The industry ledger — an Analytics feature — holds every dated event on this program: contracts, certifications, first flights and appointments, each linked to its source. See a worked example →

Type variants

VariantLaunch / first flightProduction endNotes
BAE Tempest2015 / Sixth-generation jet fighter.

Airframer

BAE Systems plcNewsIn collaboration with Rolls-Royce, MBDA and Leonardo

Other aircraft programs: BAE Mantis · BAE Systems Brontanax · BAE Systems Hawk 100 · BAE Systems MAGMA · BAE T-Series · BAE Taranis · Prismatic PHASA-35 ·

Find other programs with these properties in the aircraft programs directory.

Program milestones 38 dated events

The program’s dated history — milestones, contracts, supplier selections and facilities, each linked to its source. Log in to view.

Information on this page is compiled from a variety of published sources; links do not necessarily imply recommendation or confirmation by the airframe manufacturer.

Spotted something wrong or out of date on this page? Tell us

Corrections go straight to the editorial team that maintains this directory.