This website uses cookies
More information
Navigate directly to favourite company, aircraft and sector pages with our tracker feature.

Back

Update tracker

Bell V-280 Valor

This page lists recent changes to Airframer's data relating to this aircraft program.

16/07/2026Syensqo (was Solvay) (linked to Adhesives)
16/07/2026Syensqo (was Solvay) (linked to Composite Materials)
16/07/2026Syensqo advanced materials power US Army's MV-75 Cheyenne (press release)
13/07/2026Parker : Lord Division (link to Inspection & Non-Destructive Testing: Tail rotor tension torsion strap)
13/07/2026Israel Aerospace Industries Ltd. - LAHAV Aero-Structures (link to Engine Structure & Casings: Nacelle structures)
13/07/2026Israel Aerospace Industries Ltd. - LAHAV Aero-Structures (link to Engine Structure & Casings: Seating systems for the tiltrotor)
18/06/2026Bell completes first two wing structures for the MV-75 (news)
07/05/2026Q4 Services, Inc. (linked to Personnel & Training: Next-generation visual display system for the Engineering Simulator)
06/05/2026Bell and KAI pursue Korean MV-75 military rotorcraft program (news)
30/04/2026Bell opens Wichita line to build next-generation Cheyenne (news)
22/04/2026Bell MV-75 development continues under Cheyenne II designation (news)
16/04/2026Collins supplies key systems for US Army’s next-gen FLRAA (news)
14/04/2026Collins Aerospace, Electric Power Systems (linked to Electrical Power Systems: Main power generation system)
14/04/2026Collins Aerospace, Power & Controls - Engine Components (linked to Power Transmission: Interconnect drive system)
14/04/2026Collins Aerospace, Sensors & Integrated Systems (linked to Air Data & Flight Instruments: SmartProbe air data system)
14/04/2026Collins Aerospace, Interiors, Specialty Seating (linked to Crew Seating: Cockpit seating)
14/04/2026Collins Aerospace, Sensors & Integrated Systems (linked to Mechanical Hardware: Ice protection system)

Information on this page is compiled from a variety of sources, and links do not necessarily imply recommendation or confirmation by the airframe manufacturer.