Airframer
NewsStory

Airframer news

Deutsche Aircraft completes landing gear taxi testing

10/09/2026

Deutsche Aircraft completes landing gear taxi testing
A common landing gear architecture will be shared across the D328 and D328eco platforms. · Photo: Deutsche Aircraft

The D328 flying testbed has completed its first five development flights, accumulating over 15 hours of test time since flight testing began on 5 August 2026.

Deutsche Aircraft has completed low-speed and high-speed taxi testing for its landing gear system, followed by the initial phase of flight testing using a dedicated D328 testbed.

The legacy D328, converted into a flying testbed, has completed its first five development flights, meeting all planned test objectives. Flight testing began on 5 August 2026 and the aircraft has since accumulated more than 15 hours of test time with the new landing gear system across flight and ground activities. The campaign supports the maturation and certification of the D328eco.

Nico Neumann, CEO of Deutsche Aircraft, says: “The successful completion of the ground and taxi test campaign, together with the first flights of our landing gear testbed, is an important achievement.”

Deutsche Aircraft has switched landing gear supplier and secured full intellectual property rights for the system, bringing the architecture under its direct engineering authority. The change is intended to improve system flexibility, responsiveness and long-term product stewardship, allowing Deutsche Aircraft to manage future upgrades, secure component availability and harmonise the landing gear architecture across the D328 and D328eco platforms. Existing D328 operators are expected to benefit from a common architecture across both aircraft generations, improved lifecycle support and greater parts availability.

Aaron Tsang, Head of Design Organisation and VP Engineering at Deutsche Aircraft, adds: “Using a legacy D328 as a dedicated flying testbed has enabled us to efficiently validate the landing gear system across the full operational envelope, from structural ground testing to taxi operations and flight testing.”

The certification campaign will continue on the D328 testbed, covering braking and stopping-distance validation, steering and ground-handling evaluations, crosswind testing and unpaved runway testing, alongside high-load structural, stress, durability and reliability assessments. Data gathered will support certification activities and the continued development of the D328eco programme.

The industry ledger — an Analytics feature — collects the dated facts behind stories like this one, filterable by theme, company, program, country and date. See a worked example →

In this story

Programs covered
Sectors covered
Companies covered
Every Thursday

The Airframer Bulletin

The week’s aerospace manufacturing news, reported by our editors and delivered free to your inbox. Sign up ›

Go deeper

Who supplies whom?

Subscribers see the confirmed supply chain behind every story — complete supplier lists for each aircraft program, sector and company. See the plans ›

Spotted something wrong or out of date on this page? Tell us

Corrections go straight to the editorial team that maintains this directory.