Every Bulletin story and press release, newest first.
23,251 items · page 69 of 466
In addition to flight testing, the ASKA A5 prototype has completed 500 miles of road testing, as well as completing "Drive to Flight" transition testing while on the ground.
The first Sprayhawk production aircraft has been completed and is undergoing ground testing ahead of delivery to an agricultural partner in the US Midwest later this year.
More than 30 years ago, Crane was selected to provide a similar Proximity Sensing System for the D328 turboprop. Now the latest model will feature on the D328eco, offering Deutsche Aircraft a low-risk solution.
Green hydrogen will drive the membrane-based fuel cell powerplants in Robinson R66 organ delivery electric helicopters.
The G400 departed Savannah/Hilton Head International Airport at 9:04 a.m. and returned 2 hours, 54 minutes later, having reached a speed of Mach 0.85 and altitude of 41,000 feet/12,497 metres.
The solution integrates power management and distribution functions, including load shedding and prognostic data collection, to maximise efficient source-load matching for all phases of a mission.
Hardware is being manufactured for a full-scale ground-based high-Mach thermomechanical test, while sub-scale aerodynamic wind-tunnel testing is already being undertaken to assess intake performance.
Wright Electric will leverage additive manufacturing to quickly produce small volumes of rechargeable batteries that can stand in for legacy thermal batteries.
This marks the latest OEM contract for IS&S building on existing OEM programs with Pilatus Aircraft for the PC-24, Textron for the King Air 260/360, and Boeing for the KC-46A, KC-767A and the T-7A.
The upgrade doubles the production capacity of the TORAYCA T1100 carbon fibre, a component in the U.S. Army's Future Long Range Assault Aircraft.
The contracts renew existing agreements and cover the supply of complex castings used on a number of legacy and new engine programs.
Stellantis will fund up to $370m of the anticipated manufacturing labour costs necessary to support Archer’s planned manufacturing ramp to 650 aircraft annually.
MiddleGround aims to build out production capacity to meet increasing demand, implement procurement best practices, invest in new product development, and expand into new markets within the United States.