Every Bulletin story and press release covering Diamond DA62, newest first.
24 items
Demonstrator aircraft at Friedrichshafen show updated Garmin systems, lighting, power and cabin features across the Diamond range.
First deliveries of Brazilian assembled DA62 aircraft are expected by 2025, as a result of a partnership that represents an important resumption in the assembly of certified light piston aircraft by Aeromot.
The FIS module is located behind the operator seat, and is wired up to the mission power panel and the dedicated antenna connection panel. A configuration change from ISR to FIS takes less than a day.