PRESS RELEASE
Issued by: AeroComposite-Ulyanovsk
On March 4, the second composite wing panel for MC-21 airliner manufactured by AeroComposite (a UAC member) was delivered to the plant of Irkut Corporation (a UAC member).
Currently Irkutsk aviation plant is occupied with connection of the first wing panel with the fuselage and installation of aircraft systems. AeroComposite-Ulyanovsk production site performs assembly of the composite wing box for strength and static tests in TsAGI (Central Aerohydrodynamic Institute), as well as manufacturing of composite panels for MC-21 static tests.
| Contact details from our directory: | |
| AeroComposite-Ulyanovsk | Wings |
| Related aircraft programs: |
| Yakovlev MC-21-300 |
| Related directory sectors: |
| Airframe Assemblies |
Weekly news by email:
See the latest Bulletin, and sign up free‑of‑charge for future editions.
GE Aerospace grows in West Jefferson to meet narrowbody demand
UAVOS and Mira complete 48-hour ApusNeo 18 test
R-R accelerates airflow simulations using quantum computing
Dassault and Thales enter strategic partnership for defence AI