PRESS RELEASE
Issued by: JSC Yakovlev Corporation (Irkutsk Aviation Plant)
The MC-21-300 test aircraft performed another flight, which completes the first stage of the in-plant testing.
At this stage, in accordance with the test program, a set of the following works were successfully performed:
The characteristics of stability and controllability of the aircraft in various configurations of high-lift devises with released and retracted landing gear.
Aerodynamic corrections of the system for measuring altitude and speed parameters in the range of heights and velocities determind.
Various modes of the power plant operation in flight and on the ground have been tested.
The working capacity of aircraft systems were tested, including the in-flight workability of an emergency ram air turbine.
Designers of the Engineering Center of the Irkut Corporation and specialists of the flight test division of the Yakolev Design Bureau are processing the received information. At the same time preperations of the MC-21 aircraft for the next stage of flight tests are beginning.
| Contact details from our directory: | |
| JSC Yakovlev Corporation (Irkutsk Aviation Plant) | Airframer |
| Related aircraft programs: |
| Yakovlev MC-21-300 |
Weekly news by email:
See the latest Bulletin, and sign up free‑of‑charge for future editions.
Embraer focuses on cabin enhancements for Praetor upgrades
Leonardo selects clean-sheet Pegasus hoist for AW139
Major airframers lean on CPI experience
Odys Aviation teams with Motion Applied on hybrid-electric architecture