PRESS RELEASE
Issued by: Boeing Commercial Airplanes
Boeing (NYSE: BA) began fuselage assembly of the first 747-8 Intercontinental at the factory in Everett, Wash. Mechanics loaded panels for the 31-foot, 8-inch (9.6 m) long front section of the new airplane into the assembly tool. The panels are part of section 41, the area of the fuselage that houses the flight deck on the upper deck and the forward passenger cabin on the main deck, an area that most airlines typically configure with first class seating.
The 747-8 Intercontinental is the new, high-capacity 747 that offers airlines the lowest operating costs and best economics of any large passenger airplane while providing enhanced environmental performance. Boeing has 109 orders for the 747-8 -- 33 for the 747-8 Intercontinental and 76 for the 747-8 Freighter. The first 747-8 Intercontinental is scheduled to deliver in late 2011.
| Contact details from our directory: | |
| Boeing Commercial Airplanes | Airframer |
Weekly news by email:
See the latest Bulletin, and sign up free‑of‑charge for future editions.
Honeywell supplies LED landing search light for MV-75
Indra advances UAV collision avoidance with 360-degree detection trials
Northrop Grumman delivers 1,500th F-35 centre fuselage from Palmdale
Kratos expands in Birmingham with systems integration facility