PRESS RELEASE
Issued by: Boeing Commercial Airplanes
The sixth and final Boeing [NYSE: BA] 787 Dreamliner designated for flight test is now undergoing final assembly in Everett, Wash. The airplane, designated ZA006, will be powered with General Electric GEnx engines.
Progress continues on the fleet. The first flight test airplane, ZA001, is getting its paint touched up this week before finishing factory testing. Power was brought onto the second airplane, ZA002, in late February and build verification tests are progressing well. Production work continues on ZA003, ZA004 and ZA005. In all, assemblies for 31 Dreamliners are currently in production throughout the supply chain.
The 787 Dreamliner has orders for 878 airplanes from 57 customers.
| Contact details from our directory: | |
| GE Aerospace Engines | Turbofan Engines, Turboshaft Engines, Turboprop Engines |
| Boeing Commercial Airplanes | Airframer |
| Related aircraft programs: |
| Boeing 787 Dreamliner |
| Related directory sectors: |
| Engines |
Weekly news by email:
See the latest Bulletin, and sign up free‑of‑charge for future editions.
GE Aerospace grows in West Jefferson to meet narrowbody demand
UAVOS and Mira complete 48-hour ApusNeo 18 test
R-R accelerates airflow simulations using quantum computing
Dassault and Thales enter strategic partnership for defence AI