Airframer
Quintus Technologies Quintus Technologies
ProgramsTecnam P2008

Aircraft program

Tecnam P2008

In production
Logbook Follow this page and keep your own private notes on it — log in to start

High wing single piston light aircraft.

Lift type
Fixed wing
Construction
Factory-built
Control
Piloted
Engine type
Piston
Application
Ultralight

Design & construction

Primary structure
Composite
Wing
Aluminium
Landing gear
Fixed tricycle
Ice protection
None
Pressurisation
Unpressurised
Flight controls
Mechanical
Autopilot
2-axis
Avionics architecture
Standalone glass
Environmental control
None-unpressurised
Wing position
High
Planform
Straight
Tail
Conventional
Certification
Part 23
Minimum crew
1
Composite fuselage (primary structure) Primary

Technical reference compiled with AI research; a value appears only where two independent research passes and a web fact-check agree. Gaps are deliberate.

A deeper insight into the Tecnam P2008

Supplier geography and market analysis for this program — shown free on sponsored programs, or with an Analytics subscription.

See Analytics rates
The industry ledger — an Analytics feature — holds every dated event on this program: contracts, certifications, first flights and appointments, each linked to its source. See a worked example →

Type variants

VariantLaunch / first flightProduction endNotes
Tecnam P2008 US-LSA2009 / 2009Two-seat side by side high wing lightplane with carbon fibre fuselage adapted to LSA category.
Tecnam P2008 JC2012 / 2009Production: 76 (2024). CS-VLA compliant version, includes MkII variant.
Tecnam P2008JC NG2025 / Production: 5 (2026) GAMA: TECNAM Aircraft P2008JC. Next Generation variant with upgraded engine, redesigned central console, and optional autopilot.

Airframer

Costruzioni Aeronautiche Tecnam S.p.A.News

Other aircraft programs: Tecnam P2002 · Tecnam P2006T · Tecnam P2010 · Tecnam P2012 Traveller · Tecnam P92 · Tecnam Rivale ·

Find other programs with these properties in the aircraft programs directory.

Program milestones 16 dated events

The program’s dated history — milestones, contracts, supplier selections and facilities, each linked to its source. Log in to view.

Information on this page is compiled from a variety of published sources; links do not necessarily imply recommendation or confirmation by the airframe manufacturer.

Spotted something wrong or out of date on this page? Tell us

Corrections go straight to the editorial team that maintains this directory.