HAL wishes to clarify the status of LCA MK1A deliveries to the customer for all stakeholders.
HAL confirms that five aircraft are fully ready for delivery, incorporating major contracted capabilities in accordance with the agreed specifications. An additional nine aircraft have already been built and flown. Upon receipt of engines from GE, these aircraft will be made ready for delivery.
All design and development issues identified are being addressed in an expedited manner. HAL is in active discussions with the Indian Air Force to deliver the aircraft at the earliest.
HAL has received five engines from GE as on date. The supply position from GE is positive, and the future delivery outlook aligns with HAL’s delivery plans.
HAL assures that it will meet the guidance projected for the current Financial Year.
| Contact details from our directory: | |
| Hindustan Aeronautics Ltd. (Aircraft Division Bangalore) | Airframer |
| GE Aerospace Engines | Turbofan Engines, Turboshaft Engines, Turboprop Engines |
| Related aircraft programs: |
| HAL Tejas |
Weekly news by email:
See the latest Bulletin, and sign up free‑of‑charge for future editions.
Garmin expands flight test footprint with Mesa Gateway acquisition
ERC System begins flight testing Romeo prototype in Munich
Electra.aero secures US patents for hybrid-electric blown-lift control system