This website uses cookies
More information
Navigate directly to favourite company, aircraft and sector pages with our tracker feature.

AIRCRAFT PROGRAM

Airbus A220

Lift typeFixed wing
Construction typeFactory-built
Control typePiloted
Engine typeTurbofan
ApplicationCargo, Passenger medium
Final assembly Montreal (Mirabel) , Mobile Downtown
Search for other aircraft programs with these properties on the Aircraft Programs directory page.

Subscribe today
and log in for unlimited access

PDF Report
Subscribers can download an Index PDF report about the Airbus A220. It includes contact details for suppliers, with cross-references by category and country, and is updated every day!
If you are a subscriber, then please log in to access your copy of the report. If not, then why not take advantage of our cost-effective subscription rates...

Family of twin-jet narrow-body airliners. Final assembly in Mirabel, Canada and also Mobile, Alabama from 2020. Designed by Bombardier and previously known as Bombardier C-Series, CS100 and CS300. Airbus acquired a majority stake in the program in 2018 after which the C-Series was known as A220 with 2 variants A220-100 and A220-300.

Aerodynamic swept low wing with winglets, sweptback tail-surfaces and wing-podded Pratt & Whitney turbofan engines, as well as a largely composite structure contribute to high efficiency of the aircraft. Composite wings, radome, belly fairing, engine nacelles, rear fuselage and tail surfaces; aluminium-lithium centre fuselage; titanium engine pilons and extreme tailcone. Large passenger windows, wide seats and overhead bins.

Two crew with two EFIS displays, fly-by-wire flight controls and side-stick controller.

Type variants

Variant Launch/First flight Production end  
Airbus A220 2008 / 2013 Twin-jet airliner, 108 to 133-seater, previously known as CS100.
Airbus A220-300 2008 / 2013 130 to 160-seater variant with fuselage extended by 2 plugs, prevosuly known as CS300.
Airbus ACJ Two-Twenty 2020 / 2021 Business Jet variant based on A220-100.

Recent news

View full news archive for the Airbus A220.

See recent updates (latest 05/09/2024)

Operations data

For detailed information about current charter operators, maintenance and training providers, and completions services for this aircraft, please consult our sister publication Business Air News: Airbus ACJ TwoTwenty

Supply chain

  (193 links)
Management Professional Services (1)
Design Design (1) Design Software (5)
Materials Composites (7) Metals (5) Non-metal Materials (1)
Components Active Electronic Components (1) Actuation (1) Bearings (1) Electrical Components (3) Lighting (2) Mechanical Components (8) Mechanical Connectors (1) Non-Mechanical Components (1) Passive Electronic Components (2) Sensors, Transducers & Detectors (1) Structural Components (7) Valves (2) Windows & Glass (1)
Airframe Systems Airframe Assemblies (19) Cabin Interiors (5) Cargo Systems (1) Environmental Systems (8) Fluid Power (3) Landing Assemblies (3) Oxygen Systems & Equipment (1) Safety & Security Systems (4)
Avionics Avionic Components (1) Flight and Data Management (4) Imaging and Visual Systems (1) Indicators and Instruments (5) Navigation Aids (Airborne) (1) Warning Systems (1)
Power Systems Auxiliary Power (2) Electrical Power Systems (1) Engine Components (8) Engines (1) Fuel Systems (1) Power Transmission (2)
Production Computer Integrated Manufacturing (3) Handling Equipment (1) Heat Treatment (1) Machining (3) Manufacturing Services (4) Metal Removing (1) Processes (1) Production Control (1) Production Equipment (2) Sheet Metal Processes (1) Surface Treatment (1) Technical Consultants (2) Tooling (5)
Testing Computer-Aided Testing (1) Test Equipment (3) Test Services (2)
Expand/Collapse All
Why is the data in this section obscured?

Management / Professional Services

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Design / Design

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Design / Design Software

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Materials / Composites

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Materials / Metals

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Materials / Non-metal Materials

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Components / Active Electronic Components

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Components / Actuation

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Components / Bearings

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Components / Electrical Components

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Components / Lighting

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Components / Mechanical Components

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Components / Mechanical Connectors

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Components / Non-Mechanical Components

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Components / Passive Electronic Components

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Components / Sensors, Transducers & Detectors

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Components / Structural Components

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Components / Valves

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Components / Windows & Glass

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Airframe Systems / Airframe Assemblies

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Airframe Systems / Cabin Interiors

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Airframe Systems / Cargo Systems

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Airframe Systems / Environmental Systems

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Airframe Systems / Fluid Power

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Airframe Systems / Landing Assemblies

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Airframe Systems / Oxygen Systems & Equipment

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Airframe Systems / Safety & Security Systems

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Avionics / Avionic Components

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Avionics / Flight and Data Management

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Avionics / Imaging and Visual Systems

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Avionics / Indicators and Instruments

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Avionics / Navigation Aids (Airborne)

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Avionics / Warning Systems

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Power Systems / Auxiliary Power

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Power Systems / Electrical Power Systems

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Power Systems / Engine Components

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Power Systems / Engines

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Power Systems / Fuel Systems

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Power Systems / Power Transmission

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Production / Computer Integrated Manufacturing

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Production / Handling Equipment

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Production / Heat Treatment

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Production / Machining

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Production / Manufacturing Services

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Production / Metal Removing

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Production / Processes

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Production / Production Control

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Production / Production Equipment

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Production / Sheet Metal Processes

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Production / Surface Treatment

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Production / Technical Consultants

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Production / Tooling

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Testing / Computer-Aided Testing

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Testing / Test Equipment

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●

Testing / Test Services

●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
●●●●●●●●●● ●●●●●●●●●● ●●●●●●●●●●
Information on this page is compiled from a variety of published sources, and links do not necessarily imply recommendation or confirmation by the airframe manufacturer.