PRESS RELEASE
Issued by: Boeing Commercial Airplanes
With a successful first flight on April 25th, Boeing has added the fourth and final flight test aircraft to the KC-46 Pegasus fleet, a 767-2C.
During the 1 hour, 40 minute flight, test pilots performed operational engine checks, flight controls and environmental systems checks and took the 767-2C to a maximum altitude of 39,000 feet prior to landing at Boeing Field, south of Seattle.
The 767-2C is a KC-46 without the aerial refueling system installed. This aircraft, known as EMD-3, will be used to conduct environmental control system testing, including hot day/cold day testing and smoke penetration testing.
As part of the contract awarded in 2011 to design and develop the U.S. Air Force's next-generation tanker, Boeing has built four test aircraft – two are configured as 767-2Cs and two as KC-46 tankers. Eventually, both 767-2Cs will become KC-46 tankers.
EMD-1, the first 767-2C test aircraft, has completed more than 315 flight test hours since its first flight in December 2014. EMD-2, the program's first KC-46 tanker, made its maiden flight in September 2015 and has completed more than 240 flight test hours, including refueling F-16, F/A-18 and AV-8B aircraft. It also has been refueled by a KC-10 tanker. EMD-4, the second tanker, first flew on March 2, 2016 and has completed 25 flight hours.
Boeing plans to build 179 KC-46 aircraft for the U.S. Air Force.
| Contact details from our directory: | |
| Boeing Commercial Airplanes | Airframer |
| Related aircraft programs: |
| Boeing 767 |
Weekly news by email:
See the latest Bulletin, and sign up free‑of‑charge for future editions.
CubCrafters offers Garmin AXIS across entire lineup
Collins in Wolverhampton begins testing electric actuation
Cirrus TRAC10 trainer gains dual touchscreen flight deck
Electra’s EL9 ultra-short hybrid advances toward certification